Machining operations
Machining order
The order of the Operations list is the machining order: how to change it, why the cut-out comes last, and how to group operations by tool.
The order of the list in the Operations panel is the machining order. To change it: drag an operation, use the Move Up and Move Down arrows in the panel header, or right-click.
Tips:
- Machine what is inside the part first (engravings, pockets, holes), and the cut-out profile last: the part stays held by the stock as long as possible.
- Group the operations that use the same tool: each tool change stops the machine so that you fit the next tool (see Tool change).
- Turn off an operation’s output to try it on its own, without deleting it.
Within an operation, Dusty chooses the order: the nearest first, inner outlines before outer ones, each pocket area cleared completely before the next.
This manual is also built into Dusty: press F1, or open the Help menu, to read the topic for what you are doing. A mistake, a missing answer? Tell us
Try it in Dusty, for free.
Free CNC milling software: design, toolpaths and machine control. Mac, iPad, iPhone, Windows and Linux.