Skip to content

Machining operations

Machining order

The order of the Operations list is the machining order: how to change it, why the cut-out comes last, and how to group operations by tool.

The order of the list in the Operations panel is the machining order. To change it: drag an operation, use the Move Up and Move Down arrows in the panel header, or right-click.

Tips:

  • Machine what is inside the part first (engravings, pockets, holes), and the cut-out profile last: the part stays held by the stock as long as possible.
  • Group the operations that use the same tool: each tool change stops the machine so that you fit the next tool (see Tool change).
  • Turn off an operation’s output to try it on its own, without deleting it.

Within an operation, Dusty chooses the order: the nearest first, inner outlines before outer ones, each pocket area cleared completely before the next.

This manual is also built into Dusty: press F1, or open the Help menu, to read the topic for what you are doing. A mistake, a missing answer? Tell us

Try it in Dusty, for free.

Free CNC milling software: design, toolpaths and machine control. Mac, iPad, iPhone, Windows and Linux.