Skip to content

Dusty Link and Hub mode

Job queue and confirmation

How jobs sent to Dusty Link wait in a queue and start only after a confirmation on the device that sent them, and what other devices can do meanwhile.

Start in the job window (Studio) or Send the Project to Dusty Link… (Mac, iPad) puts the job in Dusty Link’s queue (G-code and what its pre-send check needs: tools, heights, stock top), then the start question is asked on your device. If the machine is free, the job starts; otherwise, it waits.

  • Nothing starts on its own: every job, even the next one in a queue, is confirmed on the device that sent it, machine free (the stock must be changed, the tool checked). A waiting job expires after 12 hours.
  • Only the device that sent a job starts or withdraws it; the desktop app in Hub mode can withdraw any queued job. The mobile pendant can take a job sent by another device to start it next to the machine, with its own question.
  • The confirmation is tied to the device: the number of the question asked on your device only works for it. Another device cannot start the spindle, a job or a resume with your answer.
  • During another device’s job, yours can pause, stop, adjust the overrides and follow; not move the machine or resume.

This manual is also built into Dusty: press F1, or open the Help menu, to read the topic for what you are doing. A mistake, a missing answer? Tell us

Try it in Dusty, for free.

Free CNC milling software: design, toolpaths and machine control. Mac, iPad, iPhone, Windows and Linux.